Westfield Shopping Centre

Working to a tight time schedule we took an architect's basic concept and working with the project engineers and design team to finalize the construction methods, we cut fabricated and installed five of these panels in five weeks.

The background is made from 3 mm 316 grade stainless steel laser cut with a repeating leaf motif. The larger leaves were cut from special electro-coloured stainless steel.

westfield-sign-during-construction.jpg

westfield-sign-during-construction-2-500x400.jpg